Engineering / ELV
Server Room
Plan rack space, cabling and equipment access so the site team can identify, service and expand the installation.
Discuss your project
Plan the scope
Rack and equipment layout
Inventory existing equipment and reserve space for maintenance. Agree patch panels, cable paths and power responsibilities with the facility and IT teams.
Work around live equipment
Identify systems that must stay operational. Agree labeling, relocation steps, interruption windows and who can approve changes.
Test and hand over
Inspect installation and links
Check equipment placement, cable identifiers and access clearances. Run the agreed continuity or connection checks and record exceptions.
Hand over records
Review rack elevations, patch schedules and equipment locations with the site team.
Maintenance after handover
Checks to agree with the site team
Check rack labeling, cable strain and access paths. Record moved equipment and approve changes to power and patching with site owners.
Confirm in the quotation
Prepare for a site survey
Share equipment lists, rack plans and operating constraints. Confirm whether power distribution, UPS, cooling or equipment migration is included.
Discuss your engineering scope
Share your site area, required systems and target timeline so we can discuss next steps.